pls tell about gas insulated substation?which gas is used
for that substation?above which rating we are used this
substation?how we take maintenance in that substation?it
means substation fully shutdown or live condition?if live
condition means how?pls clear this things
Each circuit-breaker bay is factory assembled and includes
the full complement
of isolator switches , grounding switches ( regular or make-
proof ),instrument transformers ,control and protection
equipment, interlocking and monitoring facilities commonly
used for this type of installation .The earthed metal
enclosures of GIS assure not only intensitivity to
contamination but also safty from electric shock.
* Above 66kV using GIS
| Is This Answer Correct ? | 4 Yes | 2 No |
Grounding. Dear all at one of my site we checked the amps at the earthing cable to the alternator it was found 125 to 130 A. at the neutal cable in same machine found 146A. in the same plant checked the earthing current on other alternator it was 52A, and neutral 116 A. we are facing problems with our controller and the card was damaged once. can that neutral/GND current be a reason? as there is common grounding for the Alternator,Brkr panel,Transformer?
The inventer is a battery, but if lost current at home u will turn on the fan but the is AC and inventer battery is dc . Then how the fan was rotating. What device Or machine in fan converst the Dc power to Ac power
please explain how to do 'pole drop test' on generator?
what is the rating of Insulation tester for measure 15 KW, 3 phase 415V 50 HZ induction motor?
When semiconductor fuse does save thyristor in each cycle of conduction? Why under voltage setting keep less in SPRS and more in DC drive?
How can we convert dc to equivalent ac??
why we are using the 2 slope in differential relay?but in busbar differential we are using only one slope. what is the reason.
What are methods to avoid the inrush current at the time of starting of power transformer ?
how we calculate the dick for a pole?
why induction motor take more current when motor start time and this current take for 1 hours when motor is start.
What is the GI Earth Flat Size recomended for 33KV 2000KVA Distribution Transformer
Are same transformer be employed for step up and step down services?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)