In india the power supply is always in multiple of 11,
eg.220 V, 440 V...
what is the reason?
Answers were Sorted based on User's Feedback
Answer / ashu
DEAR
THE FORM FACTOR FOR A PURE SINE WAVE IS 1.1
SO, THE power supply is always in multiple of 11,
eg.220 V, 440 V...
| Is This Answer Correct ? | 61 Yes | 6 No |
Answer / m.s.ramya
Since the form fator of a sine wave is 1.1,because of this
reason the power supply is multiples of 11,220 and 440volts.
| Is This Answer Correct ? | 11 Yes | 5 No |
Answer / pratik p
1.1 form factor is everywhere in world.....
K_f = \frac{RMS}{Average} = \frac{\frac{1}{\sqrt{2}}}
{\frac{2}{\pi}} = \frac{\pi}{2\sqrt{2}} \approx 1.110720735
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / vinodmalik2009
There is no specific technical reason for the adoptation of
the voltage in multiple of 11, it is just to standardise
for manufacturing of different fittings, insulators or
other switchgears accordingly to limit the varieties.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / arunkumar
i am sure that the reason for voltage becomes like multiple
of 11 is not due to the power factor.because in india
highest transmission voltage is 765 and 765 is not a
multiple of 11.so we can not say like it is due to the form
factor
| Is This Answer Correct ? | 3 Yes | 6 No |
Answer / rudra pratap singh
In India, there is a loss of 10% in overall system. So
suplly is given in the formet.........
VOLTAGE+10% OF SUPLLY VOLTAGE
| Is This Answer Correct ? | 0 Yes | 4 No |
what happens when we give supply to the secondary of a transformer ?? for example 415v(pri)/110v(sec)
ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????
how to calculate kvar in Akiva
i heard that power factor(PF) is the main concern for industries, if they are maintaining PF around 0.6 they will be fined for that. now the question is, how can they improve the PF ranging between 0.9 to 0.95 which is safe for them i,e escaping from the fine?
on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure?
what is meant by dedicated earthing?
How CFL &T5 tube light glows?
How do you compute voltage drop and cable size over distance?
what percentage of marks in B-TECH is needed for section engineering exam
what is tpdt
Which modulation has higher data rates a.fm b.am c.qam d.qpsk
Is there any Electrical supervisor license which gives permit to work whole India rather than individual state??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)