Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?

Answers were Sorted based on User's Feedback



11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / manir hussen

for above mention requirement we can use 2 nos. of CT & 1
PT

Is This Answer Correct ?    0 Yes 3 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / malik waseem

what is difference between metering CT and protection CT

Is This Answer Correct ?    1 Yes 5 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / mayil

primary o/c & E/F -1 CT
SEC o/c & E/f - 1 ct
stand by e/f - 1 ct
pry & sec metering - 2 ct
primary pt - 1 pt

Is This Answer Correct ?    2 Yes 9 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / suresh

Total 16 CT/PT are required

Is This Answer Correct ?    0 Yes 24 No

Post New Answer

More Electrical Engineering Interview Questions

what is feeder bay?

0 Answers  


Explain the propagation of harmonics in the network and influence of phase angle of harmonics.

0 Answers  


How to calcluate the current by means wires/cables in square mm

2 Answers  


What is Earthing?

16 Answers   Essar,


For polarity test on a 11/3.3kV 2.5MVA delta-star Unit Auxiliary transformer,415V 3-phase supply was applied at the HV. Connection between Aa was made with a 2.5mm cable. As soon as power was switched on the cable caught fire and burnt. This test was then abandoned. It is noteworthy to say that a similar cable was also used in a similar transformer for the same. The cable did not burn and test was successfully completed with good result. What is wrong? Please, help me out.

3 Answers  


Explain the following and how these are working with PLC Unit 1 I/O Module Card 2 Adaptor Card 3 Ribbon Adaptor 4 I/O bus 5 I/O Devices

0 Answers   Mayur,


what will be the maximum winding temperature of 6.6kv HT motor 450kw, Full load current 49A. 50Hz Frequency.

0 Answers   DVC,


How neutral voltage for transformer decided? eg 33kv neutral voltage for 200MVA transformer?

1 Answers   MEIL,


for 12KW motor which cable size has to select for ex.10 meter.

4 Answers  


what is difference between earhing and neutral

2 Answers  


i am completed my degree(B.E EEE) 2014 anychance to get electrical licence plz help me

0 Answers   JLL,


how many types of grounding?

7 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)