For 25mm thick plastering how much sand and cement is used for 1 sft
Answer / karthik rajendren
For 10 Sqm = 10*.025=.25M3
Assume 25% Dry Mortor =0.25*1.25=0.3125
30% Wastages =0.3125*1.3=0.40625/10
For 1 Sqm =0.040625 M3
For CM 1:4,Cement
= 0.040625/5*28.8
=0.234Bags/m2
=0.234/10.764
=0.0217Bags/Sft
Sand=0.0217*0.035*4
=0.0031M3/Sft
| Is This Answer Correct ? | 4 Yes | 2 No |
how to calculate the size of triangular ring in rcc column?
0 Answers Prime Perfect Buildcon,
Brick size ? & 1 square feet brick work for use brick
what do you understand by M25 concrete
what is the cover used for footings, columns, beams ??? why they differ & how they arrive??
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
how to create our resume?
0 Answers Sunraj Construction,
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
What is the difference between stress and pressure
What is the difference between tor steel and tmt steel?
How much quantity of coping is done per day by one mason in Rmtr?
how many bricks are consumed for 01 Cum of brick work
what is the m25 test result 7 days 14 days
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)