What are different MRP types?
Answers were Sorted based on User's Feedback
Answer / hemant baviskar
MRP type determines whether and how the material is
planned.For different requirement the different types are
available in SAP. "PD"for exploding the BOM & generate the
requirement."VB" for manual reorder point,"VM" for
automatic reorder point. etc.
Is This Answer Correct ? | 123 Yes | 17 No |
Answer / santosh k
There are many types of MRP types as
1}PD
2}M0
3}M1
4}M2
5}M3
6}M4
7}VB
Is This Answer Correct ? | 80 Yes | 27 No |
Answer / mobeen ahmad
there is one more type ND ,used for no planing generaly
used in by products.because u are not planing for it.
Is This Answer Correct ? | 72 Yes | 22 No |
Answer / vadivel
The differnt types of planning procedures are
1. MPS - Master Production Scheduling
2. MRP - Material Reuquirements planning
3. Consumption based planning - (there are two types)
i) Forecast based planning
ii) Reorder point planning
a) Manual Reoderpoint planning
b) Automatic reorderpoint planning
Is This Answer Correct ? | 55 Yes | 16 No |
Answer / v.ramachandran
# Master Production Schedule
# Material Requirement Planning
# Consumption Based Planning
Automatic reorder level planning
Manual Reorder Planning
Is This Answer Correct ? | 44 Yes | 14 No |
Answer / animesh kumar
1. MRP - PD: -
2. Consumption based planning: -
a. Re order point planning: - When the stock level
reaches the reorder point set taking RLT into
consideration, the procurment order is created
automatically without considering PIR or CIR.
b. Forcast based planning: - here procurment is based
on forecat.
c. Time based planning:- Here procurment is done in
regular interval.
3. MPS: - this is set for critical material which are
excluded from MRP.
4. NO MRP: -
5. MRP in external planning: - This is set when an
additional planning tool like APO is set and planning is
done in APO.
Is This Answer Correct ? | 34 Yes | 5 No |
Answer / jinchandramule
MRP Type:
Key that determines whether and how the material is
planned. You have the following options:
Manual reorder point planning (VB)
Automatic reorder point planning (VM)
Forecast-based planning (VV)
Material requirements planning (PD)
No planning (ND)
Time phased planning (R1)
Master production scheduling (MPS)
THHANKS
Is This Answer Correct ? | 22 Yes | 2 No |
Answer / anand patil
there are one more type of MRP XO which planning can done
in APO and purches order in R/3.
Is This Answer Correct ? | 21 Yes | 7 No |
Answer / miten dalwadi
M0
M1
M2
M3
M4
ND
P1
P2
P3
P4
PD
R1
R2
RE
RF
RP
RR
RS
V1
V2
VB
VI
VM
VS
VV
X0
Is This Answer Correct ? | 21 Yes | 12 No |
Answer / ganesh
Following mrp type are defined in SAP
ND for no MRP
PD for MRP
VB for manual reorder point planning
VM for automatic reorder point planning
V1 manual reorder point planning including external requirement
V2 manual reorder point planning without external requirement
VV for forcast based planning
Is This Answer Correct ? | 4 Yes | 0 No |
What is Variant configuration?
What are the main controls in MRP?
If you are not assign components to workcenter then wt will be happen..??
Explain LTP.
which process is complex ? REM or Discrete manufacturing.
In sugar industry... baggases is produced. is it considered as by-product or co-product? n why by-product n why not co- product, vice versa, plz give brief explaination? see baggase, we never sale it. It is used for the power generation. plz suggest me as early as possible.
What is Production scheduling Profile and use of it?
How many types of SOPs are there?
What is the purpose of Catalog? how you reverse UD?
What is scheduling
Explain the mrp list and their uses.
Hi Sir, Please guide me i am an BSc computer science graduate with MBA in Agri business having 3 years of exp in Food Processing Industry in Production please advice shall i persue with SAP PP? Many thanks