Answer Posted / vadivel
The differnt types of planning procedures are
1. MPS - Master Production Scheduling
2. MRP - Material Reuquirements planning
3. Consumption based planning - (there are two types)
i) Forecast based planning
ii) Reorder point planning
a) Manual Reoderpoint planning
b) Automatic reorderpoint planning
Is This Answer Correct ? | 55 Yes | 16 No |
Post New Answer View All Answers
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
What is recursive BOM
What is MRO area & MRP group & some difference
What is a ‘bom’?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
How mrp (material requirement planning) types are classified?
Define stock requirement
Have you used Pull list or back flushing in REM?
Why is work scheduling required for semi finished and finished products?
What is the data you give in S.O.P screen?
What are the ‘bom categories’ supported by sap?
How the processing time is calculated in a wc when both labor, machine categories exist?
Explain different inspection type you used .
Define 'sop' (sales & operations planning)?
How to insert an inspection checkpoint at the end of an operation?