Answer Posted / jinchandramule
MRP Type:
Key that determines whether and how the material is
planned. You have the following options:
Manual reorder point planning (VB)
Automatic reorder point planning (VM)
Forecast-based planning (VV)
Material requirements planning (PD)
No planning (ND)
Time phased planning (R1)
Master production scheduling (MPS)
THHANKS
| Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
What is the difference between pp and pp-pi? Which one is better and how ?
What is collective order. Pre requisite of the collective order?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
How to create prt master records?
Mention what are the t-codes for creating, changing and summarizing bom?
What is primary cost and secondary cost?
What are some important tables used in pp (production planning)?
define variable cost
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
Why work scheduling view is required for semi-finished and finished products?
What is scope of planning?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What is a ‘work center’ in pp?
Define ‘bom group’?
What are the keyfields found in mrp view 1?