Dear Engineers,
Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter
1. No. of Standard Brick
2. Requirement of Cement Bags
3. And Concrete for Steel, Cement, sand, etc
Thanks
No Answer is Posted For this Question
Be the First to Post Answer
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is the name of instrument to find the camber of a road?
what is meant by GANTRY GIRDER?
how to calculate rate analysis for shuttering of waffle slab
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
What is the Maximum %age of Steel in columns and beams ?
what are RIB slabs explain about it
How Much the Lean concrete Density?
0 Answers Techno Unique Infratech,
What is the exact meaning for under & over reinforced beams & when they have to used..
11 Answers Gammon, L&T, MEIL,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)