Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
No Answer is Posted For this Question
Be the First to Post Answer
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
important question on stones
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
what is the dimensions of river sand truck trailer or trolly ?
how to calculate the quantity of plaster.
Why do we use steel in Column? Why HYSD bar is preferable than plain bar?
for what perpuse we use CBR test in road project?
in brick masonry,what are the types of bonds?where which type of bond is used?& why?Also what is header & closer?
1 cu.m contain how many hollow & solid bricks?
what is the use of bottom reinforcement in Cantilever Beam?
whou haat goals do you have in your career
I want to know about history of civil engineering?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)