Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
Answer / arbaz shaikh
16922sq ft=basement,
32022sq ft=super structure rehab
69087sq ft= for sale structure
Scope of work-rcc work,brick(siporex)block work,plaster.
Concrete(m-25 to m-50) -1.25cft.Sqft of bua,(for super structure.
4cft sqft of bua (for basement)
Consumption of steel(fe 550d) -5.5 kg sqft of bua for super structure.
12 kg sqft of bua for basement
What should quotation for this please guyz help me out .?
Is This Answer Correct ? | 0 Yes | 0 No |
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
how we can calculate the capacity of a proposed canal in a command area.
5 Answers KPL, MPPSC Madhya Pradesh Public Service Commission,
Why we add salt in silt content test of sand? Full reason ?
What is alternate bid?
why spacer in reinforcement?
What is the standard size of a brick used in North India?
types of piles?
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
For M25 concrete ,what is the maximum compressive strength at 28 days ?
6 Answers L&T, Techno Builders,
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
The point of contraflexure occurs in