Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.



Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation ..

Answer / arbaz shaikh

16922sq ft=basement,
32022sq ft=super structure rehab
69087sq ft= for sale structure
Scope of work-rcc work,brick(siporex)block work,plaster.
Concrete(m-25 to m-50) -1.25cft.Sqft of bua,(for super structure.
4cft sqft of bua (for basement)
Consumption of steel(fe 550d) -5.5 kg sqft of bua for super structure.
12 kg sqft of bua for basement
What should quotation for this please guyz help me out .?

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

0 Answers  


how we can calculate the capacity of a proposed canal in a command area.

5 Answers   KPL, MPPSC Madhya Pradesh Public Service Commission,


Why we add salt in silt content test of sand? Full reason ?

1 Answers   CCCL, JSW,


What is alternate bid?

0 Answers  


why spacer in reinforcement? 

3 Answers   ECCI,






What is the standard size of a brick used in North India?

3 Answers  


types of piles?

4 Answers  


How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed

1 Answers   Adhunik,


For M25 concrete ,what is the maximum compressive strength at 28 days ?

6 Answers   L&T, Techno Builders,


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

0 Answers   HPCL,


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

0 Answers  


The point of contraflexure occurs in

10 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)