sir i want to know that in L & T construction can we do our
6 months training proggramme cum placement???????
No Answer is Posted For this Question
Be the First to Post Answer
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
What will be current cost Rs. per Sq.Ft. of RCC slab for home construction in mumbai
how much difference we have to provide when column steel staggered
Explain the design for rcc multi-storied building?
what is the status of Brick & cube testing
What are the techniques to measure road difference?
what"s the formula to calculate the water for M15 grade concrete?
what is the difference between pumpable concrete and non pumpable concrete
What is mean by Engineers ?
How i calculate Cement sand Quantities in 100 Sq.ft Plaster?
how can we find out the ratio of cement and sand in plastering
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)