Answer / bharat raygor
shuttering area : perimeter length*height
| Is This Answer Correct ? | 1 Yes | 1 No |
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
| Is This Answer Correct ? | 1 Yes | 4 No |
In jack arch floor, the rise is kept?
how calculate the cube strength in percentage
Is there any codal provision stating the actual diameter for chair bars?
Define What is the meaning of a blue land surveyors flag?
Calculation of curtain wall of box culvert
HOW MUCH WATER DO YOU NEED TO MIX IN TO COMPACT100M3 OF ROAD QUALITY BORROWPIT GRAVEL
how to calculate water proofing area and what is the easy process. explain
whats is the Indian standard ratio for mix design M5 M10 M15 M20 M25 M30 M35 AND M40???
Sand density
Why we do soil classification?
how many jack required in1sqm area
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)