Answer / bharat raygor
shuttering area : perimeter length*height
Is This Answer Correct ? | 1 Yes | 1 No |
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
Is This Answer Correct ? | 1 Yes | 4 No |
what is the difference b/w full length and cutting length?
what is the effect of duration of earth quake on framed structures ?
Is it possible to make a feature using an overdefined sketch?
What is the quantit;(pratical method) of cement, sand, and gravel to be used in M25 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention in cuft
what is a moment connection and shear connection ? where it provided ? why it provided ?
What is the curing period for Epoxy grouts
What is the difference between routing maintenance and major maintenance in school facilities?
colum 500*500 8mm cutting lenght
Q:What is the formula of bar to bent the slab in bent slab? Second question Q: what is formula to calculate the hook?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
how much lenth of a bar increase when it bends at 90 degree.