how to estimate shuttering form work or how to take off material quantity???

Answer Posted / honnikery-007

to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the procedure of wet seiving. n percentage of silt in different type of soil?

2177


Who built the sears tower?

641


can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??

1800


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

1581


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2387






Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1427


give me the mix proportion for design mix concrete M 7.5 grade 1:4:8

3610


what do you know that m20,m25

1399


I need old MMUP exam question and answer for Civil engineering

1159


Would you cause a 55-gallon drum of water to weigh more by climbing in?

679


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

1523


Explain the design for rcc multi-storied building?

700


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1213


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

1602


What is packing Factor ?

994