how to estimate shuttering form work or how to take off material quantity???
Answer Posted / honnikery-007
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is the procedure of wet seiving. n percentage of silt in different type of soil?
Who built the sears tower?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
what do you know that m20,m25
I need old MMUP exam question and answer for Civil engineering
Would you cause a 55-gallon drum of water to weigh more by climbing in?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
Explain the design for rcc multi-storied building?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
What is packing Factor ?