Answer Posted / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
What are the Types Of DPC and its Thickness used?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
how to calculate the concrete mix m30 by volume
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
Why does the pressure increase under soil?
how many tonnes equals to one cubic feet?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
how much to get of BRC lapping in full yield and half yield ?
What are the types of slump?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what is the relation between pitch of steel and depth of slab?
trapozidal
What is the snap size in civil and how can we create it?
how to caliculate required amount of cement and sand required for 1cu.m.
How much does the leaning tower of pisa lean?