how to estimate shuttering form work or how to take off material quantity???
Answer Posted / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
what is the hanekom repairing material after concreting work
why we use 19x9x9and 20x10x10 but not other
Will water damage concrete?
five requirements of infill panels for walls?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
How can you distinguish between sorption, absorption and adsorption?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
will fix foundation bolts at site with out template is there any procedure?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
what discoveries did you have in relation to your course?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
why the openings of sieves are square io size?
what is the service corridor?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building