Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the function of neutral CT in transformer? Turn ratio of typical CT for 2MVA transformer ? or relation between full load current of transformer and neutral CT ?



What is the function of neutral CT in transformer? Turn ratio of typical CT for 2MVA transformer ? o..

Answer / k.prakashchandra

Neutral CT should be identical to line CT s for REFR

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

How much of the total hydro power potential has been exploited so far in india?

0 Answers  


for a machine R=130 KVA Y=132 KVA B=144 KVA Then what will be the total kva

3 Answers   ABB,


Can any body tell me about partial discharge test, and why it is necessary and its procedure

1 Answers  


Essential condition for parallel operation of two single phase transformer is that they should have same A polarity B kVA rating C voltage ratio D % impedance

1 Answers   wbsedcl,


Why in india freq. is 50HZ & in U.S.A. it is 60HZ?

2 Answers   MacLellan,


what is difference between earhing and neutral

2 Answers  


Why 11KV/440V distribution supply use for Domestic use?

3 Answers   Essar, Getco, Nissan,


send me all basic electrical question and answers

0 Answers  


what are the types of towers in HT transmission

2 Answers  


comparision between ACB and VCB

1 Answers  


In Aeroplane what circuitry or method use for earthing?

9 Answers   Bhel, EDA, Wind World,


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

0 Answers   BUET, VECL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)