How should i calculate Cutting length of haunch bar in a raft including cover?
Answers were Sorted based on User's Feedback
Answer / er rajkumar
it s deponding on heigt of hans bayr for ex. heigt 300 lenght 400 then 500 ans
300+400+500=1200
and hook 50+50=100
=1300
Is This Answer Correct ? | 5 Yes | 32 No |
What is the difference in Cement content for M-20 Concrete if y ou use OPC & PPC? What is the difference in the Curing Period?
How much is anchor length ?
What is the difference between simply supported beams and cantilever beams
2 Answers Osmani Constructions,
the moisture content of the soil below which the soil volume becomes constant ie called liquid limit plastic limlt shrinkage limit none
What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?
150mm bricks size how many use 4.14 m3
what is the difference between prime coat and tack coat in road construction
How to find beam R/F cutting length
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
how do you estimate the # of bags of cement, sand & gravel.. if only given the volume of the project..
productivity of steel fitter per day
What is the amount of brick in cum we get in a BIG LORRY approx ??