what is mean by k150

Answers were Sorted based on User's Feedback



what is mean by k150..

Answer / mahammedshaiik

compressive strength in kg per m3 in mks units

Is This Answer Correct ?    3 Yes 0 No

what is mean by k150..

Answer / mahammedshaiik

compressive strength in 28 days for 25n/mm2

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

1) What is the compressive strength of concrete 2) What is the tensile strength of steel 3) Why cracks are happening in walls

8 Answers   L&T,


what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?

1 Answers  


The foundations are placed below ground level, to increase?

0 Answers  


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

0 Answers  


At which temperature in deg Celsius Asphalt is used for the pavement of Roads?

2 Answers  






what is lap length? why it is required?

4 Answers  


if L*B*H = 20 then direct no of bricks =20 *500

2 Answers   L&T,


Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,

1 Answers  


five requirements of infill panels for walls?

0 Answers  


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

0 Answers  


anyone can tell me the consumption of steel and concrete per sqft.?

2 Answers  


detailed calculation of the amount of cement used?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)