If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Answers were Sorted based on User's Feedback
Answer / cherry
we have to calculate the date that the next day of cube catsting is.29th day
| Is This Answer Correct ? | 0 Yes | 2 No |
what are different grades of concrete and their classifications?
What are some structures that are subjected to fatigue?
what is slope provided to floor?
How and where from do we get 162 for calculating sectional weight of TMT
When brick size is 3x5x9" , what would be the number of Brick requirement for 100 sqft area of 5" width?
Why size of brick used at site is different from its standard size ?
What is the best type of wood glue?
How to hide dimensions in autocad?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
how to calculate of m20 c.c road work 1cu.m
what is penetration test?why it is done?
what is the unit of heat of hydration?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)