Answer Posted / b.nagaraju
BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
what is mean by reestimation?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
What are your future hopes for this job?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
what is tension column?
what is civil enginnering & what you need of this course?
how to calculate rate analysys of 1:6 plastering 10 sq m
Draw the cross section of a boundary wall and label its part with detailing?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
what is the clear cover for shearwall?
What is the difference between Grade I, II and III of GSB?
Define What does civil status mean?