Why we stop the concrete in 1/3 rd of span length
Answer / anuranjan kumar
after l/3 tesion zone develope in mid span so always stop concreting with in l/3
| Is This Answer Correct ? | 13 Yes | 2 No |
What are your goals?
1 Answers Cisco, Flextronics, Hexaware,
what is the advantage of electronic theodolite over transit theodolite?
what are the ffactors you considered choosing the course?
what is P.C.C ?
what is water cement ratio and how to calculate it after designing the concrete?
what is the painting co efficient of slope roof tiles?
what are the differences between opc cement and ppc cement in applications?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
What is 1/8 on the architect ruler denotes?
what is the difference between stress and pressure??
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)