Why we stop the concrete in 1/3 rd of span length
Answer Posted / anuranjan kumar
after l/3 tesion zone develope in mid span so always stop concreting with in l/3
Is This Answer Correct ? | 13 Yes | 2 No |
Post New Answer View All Answers
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What does civil engineering mean?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
For what purpose bedding is used under storm water drains, explain?
Define angular dimension?
In which code the the maximum height of concrete casting has been explained
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
How many litres of water used for curing of 1000sqft of slav
what is tension & compression of steel bending.
at which depth the construction of tunnel is economical from cost and engineering aspect.
give me the rate analysis for Bituminous Macadam and SDBC
what discoveries did you have in relation to your course?
In cement making,what is meaning of blend,fineness,density.