what is P.C.C ?
Answers were Sorted based on User's Feedback
Answer / nadim
P.C.C. full form is PLAIN CEMENT CONCRETE which consist of CEMENT , SAND and CRUSHED AGGREGATES (metal 1 & 2)
usually its made in a NOMINAL MIX
| Is This Answer Correct ? | 41 Yes | 1 No |
Answer / anand kumar singh
P.C.C stand for plain cement concreate and its also know as
pre-cast concreate,which is mixed in propertion of the
cement ,aggeregate(coarse or fine ),sand and water.Pcc is
strong in compression but weak in the tension and shear.
It's commonly use in Foundation work and flooring in building.
| Is This Answer Correct ? | 24 Yes | 5 No |
Answer / pashupati paras from kahgaria,
Pcc stand for plain cement concrete and
its also knw as pre-cast concrete which
is mixed in properation of the
cement,aggeragate sand water ...pcc is
strong in compression but weak in the
tension and shear .
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / ashish shah-surendranagar
Plain Cement Concrete (Nominal Mix)
| Is This Answer Correct ? | 5 Yes | 2 No |
pcc is the
levelling course in
b/w soil & rcc
| Is This Answer Correct ? | 5 Yes | 3 No |
how to convert kg/m3 to cu ft
Why we use Reinforcement out side of the column not in centre
what is the weight of 6000 psi concrete in lb/cft?
Which standard describes the tolerance limit for undulation of RCC wall/ after POP surface?
how can i come to same questions after get answer of one question from table,because if i click for one answer and after get the answer i try to come back on same questions i cant access them the questions change, it break up my link and i jummp here and there so plz tell me the way by which i can back to the same page of questions so can continoue my proper notes thanx
What is the method of soil replacement test?
How much area can plaster with one bag of cement?what is the size of the fuji blocks?
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
what is rolling margin of steel
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?
What are the types of ladders?
Instead of sand blasting is there any method to clean the rust of steel ???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)