Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When testing an earthing connection, we use a 60 or 100 candle bulb with a phase connected direct from supply and the other wire to the new earthing provided.If the bulb glows then the earth is ok.Else earth connection is not Ok.
So, why dont we can use all the home appliances taking a single wire from the phase and the return connection to Earth instead of return connection to neutral?

Answers were Sorted based on User's Feedback



When testing an earthing connection, we use a 60 or 100 candle bulb with a phase connected direct fr..

Answer / k.prakashchandra

100 W bulb draws about 0.5 A , hence the voltage drop for 5 ohm ER is about 2.5 V which is not noticeable . For 10 A load , the drop would be about 50 V .

Is This Answer Correct ?    2 Yes 2 No

When testing an earthing connection, we use a 60 or 100 candle bulb with a phase connected direct fr..

Answer / karthick

Because, neutral volt is '0'v when the phase is increase neutral volt also increase so neutralvolt reduce though earth

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

what happen if we supply ac to the field of a alternator?

5 Answers  


A group of machines (wind turbines) connected with 33KV feeder and each machines are having individual VCB. The 33KV feeder connected with 110KV/33KV substation. The 33KV feeder tripped by over current at Substation and fault recorded at Substation as OC-R&Y phase. Same time the group of machines VCB tripped by over voltage, the fault recorded voltage was above 66KV by numerical Under/Over voltage relay. While grid drop time, this much of voltage hike is possible?

1 Answers  


is synchrnous pannel is need for two eqal rating transformers to run in parallel

1 Answers  


what is function of capacitor in ceiling fan?

11 Answers  


how current is reverse from its normal direction during the fault?

0 Answers   HGF,


what is mean by Digital Logic Meter (DLM)

0 Answers  


what is the differenc between A.C. and D.C, which is more dangerious?

4 Answers  


how many testing use in power transformer?tell equipment names?

2 Answers   ABB, Electrical,


write circuit diagram for a motor rotate in forward direction once it started and when pressed the same button it should rotate in anticlockwise.

0 Answers  


How much the fault level of 11 k.v.,22 k.v., 33 k.v. (in Maharashtra- M.S.E.D.C.L) for calculation of short circuit current & selection of h.t.cable.

1 Answers  


1)what is hypo test. 2) which cable need to hypo test.3) when hypo test can be done before or after glanding.4) what is the purpose of hypo test.

5 Answers  


what is the principle of tubelight ??? what is the function of starter and choke ???

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)