The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me
Answers were Sorted based on User's Feedback
Answer / unnu
Once the first floor slab is set , you can give support for the 2nd floor slab. Nothing is going to give away.FF slab will be already supported by columns
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / ajay saini
actually this condition is due to failure of planning or due to change in planning.but if you have planning of this type of work you should design the load bearing members according to your building design.
Is This Answer Correct ? | 1 Yes | 1 No |
How to construct a water sump in a rocky soil?
it is a corrected question." make a list of engineering property(properties) of soil.
0 Answers AAI Airports Authority Of India, DLF,
water cement ratio
how to calculate the 45 degree bent up length. if we given that whether the total length of the slab reinforcement will increase or not. mantion it clearly please. this is for bar bending schedule purpose?
is there any information regarding MPSC2010
How you will differentiate in field between grade43 and grade53 catagory cement?
how many cubic ft. for 50 kg ( 1 bag ) cement?
If in school there are 1800 students and 80 staff how much water can be used by them per day?
Any body tell me how can we calculate 1m3 quantity of cement sand aggregrate in kg.
Whr should a joint be located in a beam if the provision of a joint is unavoidable??
What kind of tests will conduct in plastering
Why we take 162.2 in (d*d/162.2) to calculate weight of steel???