Please tell me the difference between nominal and clear
cover. Thanks.
Answers were Sorted based on User's Feedback
Answer / pvsnrao
Let us take, b = bredth of the beam
D = Overall depth of the beam.
Effective depth = overall depth-effective cover
effective cover = the distance from botttom of fibre of the
beam to the centre of reinforcement.
Clear cover = the distance from the bottom of fibre to
bottom level of the reinforcement
Is This Answer Correct ? | 209 Yes | 23 No |
Answer / h. pradeep nair
nominal cover and clear cover are the same. both are the cover from the outer concrete to the outer face of the stirrups. latest revision of IS 456 says that NC is same as clear cover
Is This Answer Correct ? | 89 Yes | 19 No |
Answer / mustafa mohd layeak
In beam of b*D dimension. considering bottom section of beam
effective cover is the distance between centre of main
bottom longitudinal rebar to the concrete extreme fibre
(bottom edge of beam).
clear cover is distance between concrete extreme fibre and
bottom edge of a stirrup
Similarly at the top section of beam
Is This Answer Correct ? | 45 Yes | 8 No |
Answer / suchith kumar
effective cover=the distance from centre of iron rod to the bottom of fibre.
clear cover=the distance from bottom of fibre to bottom of iron rod.
Is This Answer Correct ? | 20 Yes | 6 No |
Answer / joydeep dhar
Nominal cover means clear distance between face of concrete and face of main outer rebar, whereas effective cover means center of rebar to outside of concrete face, so Nominal cover < effective cover. viz. if 20 dia steel is used and nominal cover is 40mm then, effective cover will be (40+(20/2))= 50mm
Is This Answer Correct ? | 12 Yes | 8 No |
Answer / ashis pal
please tell me cover use beam & column- main bar / stirrups .
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / binubal123
In nominal cover half diameter of the beam is added along with cover depth whereas in clear cover only depth of cover is included.
Is This Answer Correct ? | 15 Yes | 59 No |
Answer / suraj verma
Clear cover is the distance between C.G of reinforcement bars and bottom most point of concrete.
Whereas ominal cover is the end to end distance of r/f bars and botom most point of concrete.
Is This Answer Correct ? | 1 Yes | 45 No |
explain the difference between short column and long column
For 25mm thick plastering how much sand and cement is used for 1 sft
1 Answers Assurance, Design Consortium,
what is zero slump concrete
Explain the different types of roofing systems?
what is daily progress of a steel fixer average how many kilograms he can fix in 8 hours average
1 Answers Al Latifia Trading Contracting,
for mortar 1:18 how much cement and sand required for 1 CM
Rectangular room is more effective than a square room because ––
For what purpose bedding is used under storm water drains?
What is the the difference between piller base and wall base ? give cost difference ?
how many hacking to be made in one sqft for concrete surface before plastering as per the IS Code
How to find out the quantity of steel FE415
16 Answers Bhel, L&T, TATA,
clear cover means the distance between main bar outer face to shuttering face. Is it right?