The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me
Answer Posted / ajay saini
actually this condition is due to failure of planning or due to change in planning.but if you have planning of this type of work you should design the load bearing members according to your building design.
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to calculate material and labor required for 100 m2 plaster?
how can we construct building without foundation providing only grade beam at ground level
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Why was the empire state building made of steel?
for pretensioning which will yield first and same for post tensioning?
what could be the production cost of 1 cum of concrete by CP30 plant
What is min thickness,min grade of conc & age of PQC ?
Which percentage of carpet area use in plot area of office building.
what is meant by residual strain?
how to check and keep control on the wastage of material at site
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What is progress payment?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
how much quantity of cement,sand and water required for 1 sq feet flooring work .
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?