what is the load capacity of bored pile pile dia 500mm
what is the list of building construction equipment & teir output?
how calculate the bearing from two coordinates?
0 Answers DPTL, HPPCL Himachal Pradesh Power Corporation Limited,
What is difference between combin footing & rapt footing
How many required steel of 1m3 slab casting?
Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
how to calculate no. of bricks for 1 cft? how to calculate cement and sand in cft?
How much is the curing time period?
Describe the term BILL OF QUANTITY (BOQ)?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
how we can calculate a bentup hook in difreeent angles.for exp.at 90 degree,45degree,60 degree..
What is the standard size of a brick used in North India?