what is the load capacity of bored pile pile dia 500mm
Answer Posted / vaibhav
40 tonnes
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
For a washout valve why are two gate valves required in normal practice?
what is conrete grade ,how are depent on concrete grad and size of concrete?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
What is meant by scaffolding coefficient?
Define block?
What is alternate bid?
The concrete slump recommended for beams and slabs; is?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
How to find out kg per Sft ?
natucher of concrete &type of concrete?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
what is the formula for Mass of cement grout (Dg)=???
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)