what is mean by super structure?
Answers were Sorted based on User's Feedback
Answer / selva mani
the structure which is above the ground level is called
super structure...
Is This Answer Correct ? | 6 Yes | 6 No |
Answer / amol s.bidwai
super structure is the part of the stucture which is above
the ground level.
Is This Answer Correct ? | 4 Yes | 4 No |
Answer / suneendra
Construction above the basement or foundation, supported by an infrastructure which in turn is supported by the substructure.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kapil gupta
Structure above plinth level is superstructure.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ajay
IT IS THE PART OF THE BUILDING,ABOVE THE PLINTH LEVEL WHICH
CAN YOU SEEN
Is This Answer Correct ? | 7 Yes | 8 No |
Answer / bembol rocco
super structure is the part of the stucture which is above
the ground level. am i correct? comment please....
Is This Answer Correct ? | 2 Yes | 3 No |
Answer / muzamil
In civil engineering super structure is buid on the
foundation which which distribute the load equally to the
sub structure ie foundation.
Is This Answer Correct ? | 1 Yes | 2 No |
super structure is rest on above the plinth beam.we can
see the see the super structure.
Is This Answer Correct ? | 0 Yes | 1 No |
How many BRICKS required for 10 cumic of brickwork
How many kilo-newtons equals 1000 kilogram?
What are the advantages of cad?
what is the mix design for M:60 with micro silica andmetakaoline?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
test procedure of fly ash bricks as per code
how to calculate MR 9(derivation)
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
y we need to take 28 days strength as compressive strength ? y cant we take 30 th day
How to calculate the length of chairs provided to support the top rebar in concrete foundation