In structural steel work what should be the wastage percentage
considered to order the material( 200x200x5mm box section) in
standard available sizes in India i.e. 6 mtrs?
Answers were Sorted based on User's Feedback
Answer / prashanth
5% of the total weight of the structural steel.
Is This Answer Correct ? | 5 Yes | 1 No |
How to calculate the quantity of water in cement mortar eg. CM 1:3?
What is aggregate?
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What is yield strength of steel?
What is the IS code of Rcc & PCC
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete
where will u provide construction joint on slab?
in the footings first which reinforcement bar has to be layed as per desi