In structural steel work what should be the wastage percentage
considered to order the material( 200x200x5mm box section) in
standard available sizes in India i.e. 6 mtrs?

Answers were Sorted based on User's Feedback



In structural steel work what should be the wastage percentage considered to order the material( 2..

Answer / prashanth

5% of the total weight of the structural steel.

Is This Answer Correct ?    5 Yes 1 No

In structural steel work what should be the wastage percentage considered to order the material( 2..

Answer / sjtbehera

It takes 2.5% to 3%

Is This Answer Correct ?    1 Yes 0 No

In structural steel work what should be the wastage percentage considered to order the material( 2..

Answer / c.p.pal

1.5%

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How to calculate the quantity of water in cement mortar eg. CM 1:3?

3 Answers  


What is aggregate?

0 Answers  


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

0 Answers  


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

0 Answers  


What is yield strength of steel?

5 Answers   Mantri,






What is the IS code of Rcc & PCC

5 Answers   Simplex,


do we decide reinforcement steel , based on bending moment ? give example with continous slab?

0 Answers  


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

0 Answers  


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

0 Answers  


How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete

4 Answers   JSW,


where will u provide construction joint on slab?

4 Answers  


in the footings first which reinforcement bar has to be layed as per desi

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)