In structural steel work what should be the wastage percentage
considered to order the material( 200x200x5mm box section) in
standard available sizes in India i.e. 6 mtrs?
Answer Posted / sjtbehera
It takes 2.5% to 3%
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
Stringer How many cm goes to landind
What is the difference between a wood shake and wood shingles?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
The 4 main factors to start a construction project are––
Describe a time when you anticipated potential problems and developed Preventive measures
how clculate excavated or backfilling quantity by simpson's rule
at which depth the construction of tunnel is economical from cost and engineering aspect.
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
why we are using stub column..? is it possible to construct steel stub column..?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Will going from a 3-tap to 6-tap increase water pressure?