what is calculation of cement, snd of 1:4 16mm,12mm plastring
Answers were Sorted based on User's Feedback
Answer / devineni srinivasa rao
calculation for 100 sq mt
quantity=1oox12=1.2
ratio=1+4=5
dry qty to wet qty=1.5
uneven surface=1.8
cement=1.8/5=0.36x1440=520kgs
sand=o.36x4=1.44 cu mt
Is This Answer Correct ? | 12 Yes | 1 No |
Answer / aabid
12 mm 1.8*1/5 = .36m3
.36*1440 = 520kg
16 mm 2.4*1/5 = .48m3
.48*1440= 691kg
Is This Answer Correct ? | 0 Yes | 0 No |
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
CM 1:4 !:5..what CM stands for?? and what is standard ratio used for external plaster??
what is meant by VDF FLOORING? why it is used?
Difine coffer dam ?
How to preparation billing for high rise building? anyhow can give the tips
what is design life of steel structures??
2. What are the grades of steel used in the concrete design?
how much cft in 1 bag cement.
9 Answers Pinto Construction, Synergy,
how to convert sand in Cft to Kgs
1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3
12 Answers Al-Futtaim, Arihant, GS, Gulf, L&T, NCC, Paras Buildtech, PR Constructions, Ramco,
1:4:6 grade 15.84cum and how much cement and sand aggricate are used
1 Answers Minartech Developers,
Process of pcc in wateredug