how to check aggregate quantity in stock yard
Answer / ratheesh
if you are kept unshapely, you can't take the proper
measurement.
if you are kept Trapezoidal shapely, we can take the correct
quantity. (you may see in Railway stations)
Is This Answer Correct ? | 1 Yes | 1 No |
how to doing or how to prepare the or which things can be done on the site when construct the building?
What is absolute pressure? How absolute pressure is calculated?
What is the use of extend command?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
How many bricks required for 1 cu.m
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
what is M & 20 of M20 concrete
11 Answers Bharti, Sheladia Associates, URC Construction,
what is the bearing capacity of hard rock
what is the meaning of 40/20 src
all engineering filed in which branch mother branch
22 Answers L&T, Manoj Pharma Ltd,
Explain the different types of building contracts?
What is is code for use TOR