how many 10mm steel are needed in 99sqft room
Answers were Sorted based on User's Feedback
Answer / pardeep kumar
Suppose Area of slab is 99.00Sq ft = 9.20Sq.m
Suppose Dia 10mm at 125C/C Bothways r/f Provided,
For 1 Sq. m Area No Of Bars = 1/.125+1=9Nos
For bothways=18 nos single layer @ 1m each bar=18m
For Single layer in 1sqm=18mx0.62kg/mx9.20sqm=102.67kg
For double layer(top & bottom)-102.67x2=205.344kg
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / nilesh kulkarni
Suppose Area of slab is 99.00Sq ft = 9.20Sq.m
Suppose Dia 10mm at 125C/C Bothways r/f Provided,
For 1 Sq. m Area No Of Bars = 1/.125+1=9Nos
For boathways = 18Nos
Length Of 1Bar =1m,For 18 nos = 18 m
Now For 9.20 Sq. m Area = 18Nos x 18 r.mtr. = 324 R.mtrs.
So Unit Wt of 10mm Dia steel =0.62 Kg/m
So for 324 r. mtrs steel =324*0.62=201.5Kg Steel reqd of 10mm dia.
| Is This Answer Correct ? | 3 Yes | 2 No |
how can i come to same questions after get answer of one question from table,because if i click for one answer and after get the answer i try to come back on same questions i cant access them the questions change, it break up my link and i jummp here and there so plz tell me the way by which i can back to the same page of questions so can continoue my proper notes thanx
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
say you are requsituoning cement to build masonry wall made of burnt clay bricks. how many 50 kgs cement bags will you requisition for 1:5 ratio mortar joint, if they masonry wall volume is 10 m3
how many cubic feet in one unit of sand?
16 Answers L&T, PSPCL, Ratna Infrastructure Projects,
how many bags of cement required in neat cement finish per square metre
how many express way in india
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
which method is used in semi-rigid connection design??
why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarification???
what is the wait of cement in different concrete mixes from M15 TO M50
limit value of bulking of sand
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)