Answer Posted / nilesh kulkarni
Suppose Area of slab is 99.00Sq ft = 9.20Sq.m
Suppose Dia 10mm at 125C/C Bothways r/f Provided,
For 1 Sq. m Area No Of Bars = 1/.125+1=9Nos
For boathways = 18Nos
Length Of 1Bar =1m,For 18 nos = 18 m
Now For 9.20 Sq. m Area = 18Nos x 18 r.mtr. = 324 R.mtrs.
So Unit Wt of 10mm Dia steel =0.62 Kg/m
So for 324 r. mtrs steel =324*0.62=201.5Kg Steel reqd of 10mm dia.
Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
How do we test on design and style in a software?
types of laps in column
how to tie 10 legged stirrups
What is portland cement
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
it is possiblee to produce concrete with out cracks...
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What is the difference between undo & redo?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
What are the techniques to measure road difference?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction