how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
No Answer is Posted For this Question
Be the First to Post Answer
M.C.Q
3 Answers Mitsui OSK Lines, TechInfini,
How much overlapping required for welding the reinforcement bars in Columns & beams
Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR
115mm thickness brick work how to required mortar
what is mean by design concrete
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?
If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
2 Answers Al Fara, Unity Infraprojects,
what is two point problem.
what is the grade of 1:2:1 concrete mix
What is the difference between first angle projection and third angle projection?
9 Answers CLG, Elecon, JTEKT, Nagarjuna Construction,
where we use one way slab and two way slab?