The company is following same question pattern and giving
same questions in all year for all batches from the starting
of company they didnt even able to frame new question,,so
guys if u want to place in cccl just mail me i will send the
questions....ramyakvb@gmail.com....if u mug all those
answers u will be selected no proper selction procedure is
considered so it is better to place in some other
company...All The best dont attend cccl



The company is following same question pattern and giving same questions in all year for all batche..

Answer / shoebullah

there is somthing wrong with
your email address .. I cant
send you a mail .. Wel it will be
help if you send me the
question paper at my email i.e
shoeb.hussaini05@gmail.com

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate concrete quantity from its density or details mentioned in rmc batch report.

1 Answers  


kindly tell me name of a book to calculate bbs?

2 Answers  


The Geological formation under subanshiri dam is- (1) sedimentary rock (2)metamorphic rock (3) igneous rock (4)none of the above

1 Answers  


how is shear resisted in a structure?

2 Answers  


i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

0 Answers  






why loss of strength in concrete in 7 days cube test i am not geting mim 7 days strength that is 67 percent for M-35 and my mix design is perfect there is no doughty,and my results are near to 7days percentage but not 67 percent.

4 Answers   UPPSC Uttar Pradesh Public Service Commission,


In BBS,Find out the cutting length for a 2000*2200 column with 50 mm cover?

1 Answers   NKG Infrastructure,


which I.S. code shown wastage in structural steel

1 Answers   ITD,


Spider cracks occur in beam bottom due to––

0 Answers  


how to calculate concrete qty for footing using M25 grade 1:1:2 for 731 cft.

9 Answers   Abuilding Lab, L&T, MPSC, Vellapally,


How much paint is required for 1sqm.?how to calculate the paint...?

1 Answers   MRKR, Sumadhura Infracon,


Deshuttering time for slab 6.15 meter

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)