The company is following same question pattern and giving
same questions in all year for all batches from the starting
of company they didnt even able to frame new question,,so
guys if u want to place in cccl just mail me i will send the
questions....ramyakvb@gmail.com....if u mug all those
answers u will be selected no proper selction procedure is
considered so it is better to place in some other
company...All The best dont attend cccl
Answer Posted / shoebullah
there is somthing wrong with
your email address .. I cant
send you a mail .. Wel it will be
help if you send me the
question paper at my email i.e
shoeb.hussaini05@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
What do you understand by “preset” during the installation process of bridge bearings?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
what is meant by shear center?????
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Which are the Steel tests ?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What is GSB gradation
what is Short bored pile foundation.
Please design 12.5m long dubbly beam
what is the function of GSB all class ?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
How to calculate 1 brss for RCC work