what quantities of work done in terms of sq.mts/day/ of
8hrs for each varpenter (shuttering) and Steel fitter in
terms of Tonnes. For slabs, Columns etc.?
No Answer is Posted For this Question
Be the First to Post Answer
numerical example of solving water cement ratio
What does civil engineering mean?
how much cement consumption in 1 sqmt of wall cleading work (dedo)?
12. Have you ever been asked to leave a position?
How Much Anailed Wire (Binding Wire) use Per KG in Running Meter ?
How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags of cement does 100 cft of concrete 1:2:4 require? Procedure to calculate the required amount. Also if there is any easy thumb rule to find out.
For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor
1 Answers RASA, Unity Infraprojects,
what is the real de-shuttering time for rcc column,slaband wall
Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?
9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement
1) what is the seewage discharge per person per day taken for design purpose as per IS codes? 2) how to convert gauge to MM like if we measure 18G as our door frame then how much is it in MM ? 3) how much binding wire is required ti tie 100kg steel ? 4) while making rings in steel reinforcement , whether the corners of rings are deducted to take out cutting length ? 5) how much carbon content should be there in steel used for construction purpose? 6) what are fe415 & fe 500 and which bars are used in general civil works?
what is the specific gravity of cement .define it and value?