extra how much quantity need to fill the actual excavated
quantity.
Answers were Sorted based on User's Feedback
Answer / nadim shaikh
depends upon the material by which the filling is needed
| Is This Answer Correct ? | 0 Yes | 0 No |
backfilling is 1/3 rd of the excavated qnty.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
| Is This Answer Correct ? | 1 Yes | 5 No |
What is need for setting limits?
how much quantity of bending wire required for 1sqmts
What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
what r remedies taken for foundation in black cotton soils..??
How much is anchor length ?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.
what is the minimum depth of cover required for pipes?
how to find quantity of concrete in PCC M15
What is different type of bills?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)