extra how much quantity need to fill the actual excavated
quantity.
Answers were Sorted based on User's Feedback
Answer / nadim shaikh
depends upon the material by which the filling is needed
Is This Answer Correct ? | 0 Yes | 0 No |
backfilling is 1/3 rd of the excavated qnty.
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
Is This Answer Correct ? | 1 Yes | 5 No |
Approximate size of the metal use for normal concrete?
satart to end steps by step process of building construction...? i want to planning theme accuretly
Please tell me 1 Sqm Steel 14mm center to center .200,.200
How much snowcem required per sq. Meter area
3 Answers Bhushan Power Steel,
how many binding wire can be required for 1 metric tonne steel?
What Are The Different Type Of Slump Test Indications?
How can calculate cement quantity in brick work
what is the least count of auto level staff
What are the different types of pile founations used?
how do you stabilize a waterlogged area in road construction
How much material is required for constructing a 2 Lane 2Km rigid pavement road
how clculate excavated or backfilling quantity by simpson's rule