extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / partha mitra
backfilling is 1/3 rd of the excavated qnty.
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
The largest size of paper used in plotter to print the drawing made by Autocad .
what is the mix design for M:60 with micro silica andmetakaoline?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
types of piles detail,
How do you prepare Material Recovery Statement for deduction from contractors bills?
How to calculate plastering for elevated water storage tank
What do you understand by “preset” during the installation process of bridge bearings?
what do you know that m20,m25