extra how much quantity need to fill the actual excavated
quantity.

Answer Posted / partha mitra

backfilling is 1/3 rd of the excavated qnty.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1408


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

4275


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1508


I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent

1782


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2053






how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

1899


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

647


The largest size of paper used in plotter to print the drawing made by Autocad .

1300


what is the mix design for M:60 with micro silica andmetakaoline?

1801


Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

1728


types of piles detail,

1815


How do you prepare Material Recovery Statement for deduction from contractors bills?

1107


How to calculate plastering for elevated water storage tank

820


What do you understand by “preset” during the installation process of bridge bearings?

669


what do you know that m20,m25