what are the construction sequences in DAM, Hygh Way /
Road, Thermal Power Plant, Hydro Power Plant, Tunnel ?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
1st is ofcourse road/highway
2nd is DAM
3rd is tunnel
4th is hydro power plant
5th is thermal power plant
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / vydehi
The construction sequence is High way/Road, Tunnel, Dam,
hydro Power Power,Thermal power plant.
Is This Answer Correct ? | 4 Yes | 4 No |
how to take quantity of steel per cum in columns
2 Answers ERRA, Skyline Builders,
what is development length,where it is used and why it is used?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
0 Answers Anish Constructions, STUP Consultants Pvt Ltd,
Basic civil interview questions
how calculate the bearing from two coordinates?
0 Answers DPTL, HPPCL Himachal Pradesh Power Corporation Limited,
difference between high way pavement and local road?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Explain what is change order request?
In cement concrete pavements why cracks are develop aolng with logitudinal&tangenteal directions
How find out Rolling margin of steel dia.wise?
How can i find number of brichs required for given quantity of wall in m^3..
5 Answers vasanth construction,
What is the Requirements of indoor & outdoor Substation Construction? What is the main Safty Requirements for SubStation Construction?