What is difference between FE-415 and FE-500???
Answers were Sorted based on User's Feedback
Answer / k manyam
Fe- 415
The yield stress is 415 N/Sq.mm
The yield stress is 500 N/Sq.mm
and other is rib spacing also differ
Is This Answer Correct ? | 39 Yes | 1 No |
Answer / madhavan
Fe- 415
The yield stress is 415 N/Sq.mm
The yield stress is 500 N/Sq.mm
and other is rib spacing also differ
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / smrutiraj mahunta
Fe- 415
The yield stress is 415 N/Sq.mm
The yield stress is 500 N/Sq.mm
and other is rib spacing also differ
Is This Answer Correct ? | 0 Yes | 0 No |
which method is used in semi-rigid connection design??
what is the proportion of stones and concrete inplum concrete??
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
Explain why concrete barriers have curved surface profiles?
What is the density of Cement, Fly ash,20 mm aggregate, 10 mm aggregate and stone dust?
14 Answers Amrapali, Egis, Himuda, Indramas, L&T,
Why are separation membranes used between concrete pavement slab and sub-base?
How can we improve the capacity of a existing foundation?
When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How to know at a glance it is complete in order, do have any one checklist format in this regard.
Brick work how many days curing and at any concreting pl
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
what is normally consolidated clay and over consolidated clay?
in BUILT UP AREA BASIS WHAT IS RATIO OF CONCRTE & STEEL RATIO MAY BE CONCIDER IN PER SQFT QTY