why provide water stopper in costruction joits
water stopper is generally 250 to 300 mm parallel to the
retainging wall. half portion inserted in to the concrete
and half portion cast 2nd time concreting work so when
water is penetrating through the joint it is retain by
water stopper.
| Is This Answer Correct ? | 5 Yes | 0 No |
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
Explain the different types of roofing systems?
wat is fe full form in fe4l5?
What is meant by Rolling Margin? & which material will effect in this ?
If length is 20 m ,width is 20 m & thickness is 80 mm then how many brass it is?
how the calculatio is taken for shuttering in staircase.
1 Answers JMC Projects, Tech Mahindra, TechnoArt,
different type of formwork?
How much steel and concrit required in 1000 square feet slab?
what is meant by civil engineer?
How to calculate unit conversion area
limit value of bulking of sand
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)