How to calculate unit conversion area
No Answer is Posted For this Question
Be the First to Post Answer
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
How to find weight of 1cu.m concrete in varies grades? and giive calculation.
Dear Sir What is the Contraction joint for base Slab
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is the max. dia of steel can be used in open footings?
How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags of cement does 100 cft of concrete 1:2:4 require? Procedure to calculate the required amount. Also if there is any easy thumb rule to find out.
i want to know the easy way to find the quantity of steel in a slab , coloumn
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
one litre of shuttering oil how much area covered the shuttering?
How to Calculate steel
how many nails in 1 sq mitar