how to calculate no. of cement bags consumed in 1:4 and 1:6
proportion RR Masonary and the quantity of sand also
Answers were Sorted based on User's Feedback
Answer / nisikanta
First of all calculate total volume of RR masonry.Then add
33% of volume more than actual volume of wet material.then
for 1:4 ;1 cement:4 coarse sand.Total volume/5=Vol of cement.
no of bags of cement=Vol of cement/.035.For 1:6 just put 6
in place of 4.
| Is This Answer Correct ? | 23 Yes | 24 No |
Answer / sudhir pawar
Part A : The data :
Cement: 330/bag
Rubble : 2562/brass
Labour :2200/brass
Sand 6500/ brass
You already know that : I brass = 100 Cft
Desired Profit 25%
Specifications :
Rubble masonry Width 18″ to 36"
for wall compound ht upto 3′ from ground level
in cement mortar in ratio : ( 1:5 )
Material for 1 cum:
Cement : 330*(0.45*1.57*28.8)/6= Rs.1119
Sand: 6500*0.3529*5*(0.45*1.57)/6= Rs.1350.50
Rubble: 2562*0.3529*1.45 = Rs.1311
Labour : 2200*0.3529= Rs.776
Total: Rs.3756 RS. 4556.50
Profit:Add@ 25%: Rs. 1139.13
Total: Rs. 5695.63 Rs/cum.
| Is This Answer Correct ? | 2 Yes | 6 No |
Answer / j.edison
cement mortar1;4 1440divided by4=360kg
cement mortar 1;6 1440divided by 6=240kg
| Is This Answer Correct ? | 17 Yes | 24 No |
Fly ash is residue generate from??
How foundation is designed, Column design and beam design
what is the basic fundamental of contouring?
if we have water only for hydration of cement,no water is available for curing of concrete.then how we can do curing of concrete
fluid flow takes place due to its:- viscosity,comprssibility,surface tension,deformation undershear force
what is the relation between seventh day strength & twenty eighth day strength of cement concrete
3 Answers KPSC Karnataka Public Service Corporation,
1sqm tile laying how much cement required?
1)What's are the diff. types of column based on loading? 2)Is there any difference bitween Development length & Anchorage Length? 3) What is the basic diff. between one way & two way slab? 4) Where should use OPC & where should PPC?
HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER.
how many litr. of paint will required for 1 sqm area of wall(internal wall and external wall) ??
what is pure bending.
what is the ratio of cement water and sand in RCC?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)