we are roofing contractors,we are filling a bill in work
contract 4.12% method, we collecting 4.12% from our customer
but every month we have been paying the vat at 2% from our
pocket on the total value of bill. our auditor told me the
above method do not collect 2% from the customer side is it
true?
# 1. size of the Bricks # 2. Minimum Crushing Strength of Bricks
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
What are the advantages of cad software’s?
What is the difference between built area and super built up area?
Who name us Engineer & Why?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Anyone have sample questions for bhel please send me since Iam appearing for this exam. Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
I dont know english very well to speak,in interview if they ask to introduce yourself means how to answer in english?
IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND &CONCREATE&CEMEBT
what is assumption consumption of steel per m3 for raft
how to find quantity of concrete in PCC M15
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)