what is assumption consumption of steel per m3 for raft
Answers were Sorted based on User's Feedback
Answer / dandamudi tanuj
Min of 100kgs steel is assumed for 1 m3 of concrete. As per the standards of IS456-2000 unit weight of pcc is assumed as 2400 & unit weight of rcc is assumed as 2500. As per these standards assumption of steel per 1m3 of concrete should me minimum of 100kgs.
Is This Answer Correct ? | 1 Yes | 0 No |
How Many Cement Bags Are Used in 1 Sqm Area for Plaster????
8 Answers Era Infra Engineering, FactSet Systems, Indu Projects, L&T, Reliance, Rites,
Why do you want to work here
How to calculate bottom width of landing in a staircase
What isthe formula for square
1 Answers Panchayati Raj Department,
what is ph value of water
why elongation index is not required for concreteing coarse aggregate..
CROSS SLOPE OF Macadam Construction
During estimation of walls of superstructure...which unit we'll use with quantity.cube or square
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is the composition of good brick ?
cement mortar 1:6 explain the cement and sand coefficient calculation?
Do you know differenence between design mix and nominal mix?