we are roofing contractors,we are filling a bill in work
contract 4.12% method, we collecting 4.12% from our customer
but every month we have been paying the vat at 2% from our
pocket on the total value of bill. our auditor told me the
above method do not collect 2% from the customer side is it
true?

Answer Posted / visal

No

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the crank rod in slab

1890


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1290


What are the uses of alloys in daily life and how are alloys made?

861


How to come 1.54 from dry to wet concrete? 

1815


what is floating slab foundation?

669






beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

1653


construction workers how much time take one work or qty

1128


What are the causes of building collapse?

660


Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000

1225


how to conversation of all construction material in to brass

4699


what is w/c ratio in dry lean concrete for m10 mix design

7979


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

1834


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

1910


what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?

1580


how gradation of aggregates effect on slump of fresh concrete?

1827