In pile foundation which kind of action are take place?
Answers were Sorted based on User's Feedback
Answer / romy som
end bearing action & skin frictions are simultaneously act
on the pile.
| Is This Answer Correct ? | 17 Yes | 1 No |
what is the hanekom repairing material after concreting work
what pressure the NP2 class RCC pipe can sustain?
How to calcuate the quantity of cement,sand for plastering 1:4 12mm thick?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
0 Answers Ministry of Agriculture,
how many cubic centimeter in one unit of sand?
in the construction of building,we are use formula for laping? such that how many formulae we use? which are them?
WHAT do mean by M-309
what is mix design
How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
how to calculate the number of cement bags for basic construction..?
3 Answers Gammon, Indu Projects,
what are the differences between shear wall and column
4 Answers BM, L&T, University of Gondar,
Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)